Fifteen projects across defence, rail, water, manufacturing, waste, research and the arts — from two 10-tonne cranes fitted inside a live 1950s hangar to a winch for a polar research vessel. Most of them had a constraint that ruled out the obvious answer.

Selected Projects

Work We Have Delivered

Each of these started with a constraint — a live site that could not stop, a listed structure, a roof that would not take columns, or a ceiling too low for a normal crane.

Defence

Kier Group MoD Lyneham Crane Installation

Two 10-tonne overhead travelling cranes installed inside an existing 1950s hangar, on a live Ministry of Defence facility that stayed operational throughout.

MoD Lyneham, UK
Read case study
Waste & Recycling

SUEZ Victoria Road Waste Transfer Site

Two fully automated 8-tonne waste handling cranes replacing systems dating from 1978, delivering a 20% increase in throughput.

London, UK
Read case study
Property & Redevelopment

Crane Refurbishment at Battersea Power Station

Historic 1930s overhead gantry cranes refurbished, with a modern 50-tonne hoist and a bespoke LED-integrated bandstand structure.

Battersea, London, UK
Read case study
Transport & Infrastructure

Bridge Gantry Inspection & Maintenance

A structured trimonthly inspection and maintenance programme for the Tamar Bridge, carrying over 40,000 vehicles a day, supported by a bespoke digital inspection application.

Cornwall & Devon, UK
Read case study
Defence

Crane Maintenance at Devonport Royal Dockyard

Continuous 24/7 crane maintenance across Devonport Royal Dockyard, supporting naval operations and the site’s lifting infrastructure.

Plymouth, UK
Read case study
Rail

Irish Rail Train Lifting Jack Installation

Eight bespoke lifting jacks installed at Fairview Depot, supporting maintenance across Irish Rail’s fleet of roughly 150 electric multiple unit cars.

Fairview Depot, Ireland
Read case study
Marine & Research

RRS Sir David Attenborough Mooring Winch

A specialist mooring winch designed and manufactured for the British Antarctic Survey’s polar research vessel, for safe deployment and recovery of scientific moorings.

Polar research vessel
Read case study
Research

Chilbolton Observatory Counterweight Replacement

13,600 kg of deteriorated counterweight plates replaced on a 25-metre antenna at an STFC research observatory.

Hampshire, England
Read case study
Manufacturing

Glenveagh Properties Overhead Crane Installation

Nine overhead cranes designed and installed at a timber and steel manufacturing facility, using the existing roof trusses rather than adding support columns.

County Carlow, Ireland
Read case study
Manufacturing

Sulzer Pump Solutions Ireland

Two stainless steel test tanks designed and fabricated for submersible pump testing, including full installation and pipework integration.

Wexford, Ireland
Read case study
Water

Overhead Crane for Water Infrastructure

A 5-tonne overhead crane designed and installed at Harrot Hill Pumping Station to support equipment handling during installation and maintenance.

West Cumbria, UK
Read case study
Public Sector

Monaghan County Council Jib Crane Installation

Two outdoor-rated manual slew jib cranes with electric hoists, for safe tail lift removal and storage at a council logistics facility.

County Monaghan, Ireland
Read case study
Tourism

Viking Splash Tour Mobile A-Frame Solution

A mobile A-frame lifting system with a 2,000 kg electric chain hoist, designed for engine and gearbox maintenance in a low-ceiling warehouse.

Dublin, Ireland
Read case study
Entertainment

Watergate Theatre Flying System

A custom pilewind winch system designed and installed to allow safe suspension of performers during live theatrical productions.

Kilkenny, Ireland
Read case study
Education

Solaris Nexum Art Installation, TU Dublin

Load testing of ceiling anchor points followed by installation of a complex suspended artwork, using rope access and wire rope pulling machines.

TU Dublin, Ireland
Read case study
The Common Thread

Why These Jobs

Almost none of these was a catalogue purchase. Three constraints come up again and again.

The Site Cannot Stop

Live defence facilities, an operating dockyard and a bridge carrying 40,000 vehicles a day. The work has to fit around the operation, not the other way round.

Lyneham · Devonport · Tamar Bridge

Nothing Off the Shelf Fits

A low-ceiling warehouse, a polar research vessel, a theatre flying performers and a 25-metre antenna. Each needed equipment designed for that one job.

Viking Splash · RRS Sir David Attenborough · Watergate · Chilbolton

Both Sides of the Irish Sea

Projects run in England, Wales and across the Republic of Ireland, under whichever regulatory regime applies at that site.

Cumbria · Carlow · Wexford · Monaghan · Dublin
Got an Awkward One?

Tell Us

The projects on this page all began with someone explaining why the normal answer would not work. If that sounds like your site, that is the conversation we are best at.