Construction Lifting Equipment & Crane Solutions

Lifting Equipment for Construction Sites and Yards

Construction lifting is two different problems that get procured as one. On site, the lift is temporary, the layout changes weekly, the equipment lives outdoors and the load is rarely the same twice. In the compound, precast yard, plant workshop or modular factory behind it, lifting is repetitive, fixed and running to a production rate. The same statutory duties apply to both. Almost nothing else about them is the same.

Key Lifting and Safety Challenges on Construction Sites

Five things account for most of the lifting problems we are called into on construction projects. None of them are solved by buying a bigger crane.

How We Support Construction Contractors

Three things, and they are usually bought together because splitting them across suppliers is where the compliance gaps appear.

Get in Touch

Tell Us About Your Project

Whether you need a single piece of equipment or a fully engineered lifting system, our specialists can help. Tell us your load, environment and compliance requirements — we’ll do the rest.

LOLER, PUWER, CDM and BS 7121: What Applies on a Construction Site

LOLER 1998

Thorough examination, SWL marking, planning and supervision of lifting operations

Six months for lifting accessories and anything used to lift people; twelve months for other lifting equipment; or the intervals set by a written scheme of examination drawn up by a competent person. Equipment assembled on site needs examination before first use.

PUWER 1998

Suitability, maintenance and safe use of work equipment

Covers the crane as machinery — controls, isolation, guarding, operator training and pre-use checks. A crane can be LOLER-certified and still fail PUWER.

CDM 2015

Client, principal designer and principal contractor duties

Installing a crane is construction work. Someone has to hold the Principal Contractor duty — we have held it on a live Ministry of Defence site.

BS 7121

Safe use of cranes: lift planning and the Appointed Person

Every lift needs a plan proportionate to its risk, signed off by a competent Appointed Person.

BS EN 15011

Design of overhead travelling and gantry cranes

Sets the duty classification. Specify to actual cycles per hour, not peak load, or the crane wears out early

BS EN 13155

Non-fixed load lifting attachments — beams, frames, clamps, magnets

A bespoke lifting beam needs design calculation, proof load test and marking. Fabricating one without that trail is not compliant.

BS EN 1090

Execution of steel structures

Runways and supporting steelwork must be fabricated to an execution class by a certified fabricator. WH Scott holds BS EN 1090.

What We Deliver in Construction Lifting Equipment & Crane Solutions

[Describe the photo you choose — for SEO]

Overhead Gantry Cranes

Overhead gantry cranes designed for safe, efficient lifting, with bespoke configurations, installation, maintenance, and lifecycle support.

Jib Cranes

Wall- and pillar-mounted jib cranes for efficient, safe load handling in workshop environments.

Mobile & A-Frame Lifting Gantries

Portable aluminium and steel gantries for temporary lifting applications where a permanent gantry is not practical.